Road safety and calm, to proceed unchecked, the route of individual skladvaetsya properly coordinated and executed stage folded into a single transport and engineering solution.
The number of required matching phases depend on the specifics of the transport infrastructure, the season and the overall weight and dimensions parameters train load of c, ie overall weight and dimensions of the parameters of a unified system of trains and cargo, the so-called binary system.
Procedures described and work performed includes the following items:
- Escort vehicles provide specially prepared car cover to meet all the requirements of the SDA. equipped with strictly according to the requirements and standards of European countries.
- The design and permits to transport bulky and heavy transport
- Escort vehicles - towers contact-cable network (CCS), to lift and electric transmission lines disconnect (power lines) on (on) route CTG
- Organization of Police escort vehicles of the countries in which pernevozka is bulky and heavy items
- A survey of roads / research route (road), sounding real heights of bridges on the whole route, transportation layout of the proposed route of transportation.
- Construction of road / track preparation for transport, the necessary additionally works (removal of road signs, structures,
- The transport engineering, preparation techniques and in some cases, revision of motor vehicles under certain transportation, development of additional fasteners nestandartezirovannogo
- Lifting, bulk cargo transshipment through the bridge construction, demolition and temporary artificial lift installations. Dual operation of cranes.
- Obtaining a permit from the environmental protection, to cut down a tree branch and was placed unimpeded passage of bulky cargo.
- Preliminary work with the load. Equipment razoborudovanie, dismantling - reducing the size of load, the removal of wheels, frames, antennas, pipes, tires, mirrors, towbar, saws, hydraulic analysis, covering cabs.
|
|